Industrial

Cherat Cement Line-II Project


CHERAT CEMENT LINE-II PROJECT

Location :

Cherat Cement Factory Nowshera, Peshawar, Pakistan.



Project :
Cherat Cement Line-II Project

Civil Works.



Client :

Cherat Cement Company Limited




Starting Dated :
February 2015



Completion Date :
March 2016


Civil, Building and HVAC Work

ARL Upgradation Project

ARL UPGRADATION PROJECT

Location :

Attock Refinery Limited, Morgah, Rawalpindi, Pakistan.

Project :
Pakistan ARL Upgradation project

Civil, Building and HVAC Works.

Contractor & Engineer :

Hyundai Engineering Pakistan (Pvt.) Ltd.

Client :

Attock Refinery Limited

Current Value :

1,025 Million Rupees.

Starting Dated :
November 2013

Completion Date :
September 2016

 




Civil, Building and HVAC Work

Tri-Pack Films Limited Phase-II


Tri-Pack Films Project

Location :

Plot# G-1 To G-4, North Western Industrial Zone, Port Qasim, Karachi.

Project :
Construction of  1653 Plant Building, Gas Power Plant and CPP Line-2 Building.

Client :
Tri-Pack Films Limited (Packages Group)

Engineer :
Progressive Consultants (Pvt.) Ltd

Current Value :
663 Million Rupees.

Starting Dated :
September 2011

Completion Date :
December 2013

 

Tri-Pack Films Limited is building a new Biaxially Oriented Poly Propylene Plant (BOPP) with a capacity of 40,000 metric tons. This shall double the combined BOPP production capacity of the company from present 30,000 tons per annum to 70,000 tons per annum.


ACL’s scope of work includes:



  • Construction of 1653 PTB Plant Building

  • Utilities Areas

  • External Sewerage

  • Water Supply

  • Fire Fighting System

  • Road & Storm Water Drainage

  • Gas Power Plant Building

  • W.H.R Chillers

  • Cooling Towers

  • Control Room and Transformer Room

  • CPP-Line-2 Building


Attock Cement

3000 TPD Plant At Attock Cement Pakistan Ltd

 

Location :
Hub, Balochistan
Client :
Attock Cement Pakistan Limited
Consultant :
A.A. ASSOCIATES
Value :
460 Million Rupees
Period :
18 Months


Scope of work
The contract for construction of civil works for ACPL Line-2 secured through a competitive bidding process. Construction work commenced in January 2005 and substantial completion, allowing plant commissioning was achieved in May 2006. The works executed comprised of process-line structures from Raw Material Preparation to Clinker Transfer including Raw Mill, Blending Silo, Pre-Heater Tower, Rotary Kiln, Clinker Cooler and Clinker Storage. Other works included Central Control Room Building, Coal feed and Gypsum Underground Service Galleries, Interval Roads and Pavements.
 

Tri Pack Films Phase-I

Tri-Pack Films Limited


Location :
Port Qasim, Karachi.
Client :
Tri-Pack Films Limited
Consultant :
PROGRESSIVE CONSULTANTS (PVT) LTD.
Value :
130 Million
Period :
12 Months


Scope of work
This fast track project of the packages group was awarded to ACL against stiff competition from the top construction firms. ACL was selected from a short list for final negotiations based on its reputation for management of fast track projects and focus on quality work. The main plant building incorporating the machine hall, storage area, utilities and ancillary area is a RCC framed shell roof structure with a covered area of approximate 11,000m2. These are 40 nos shell roof panels each of 22m X 10m. The maximum building height is 14m. The complete structural work for the building including foundations, columns, RCC beams, crane beams, shell roof panels and the gallery area will be completed in a six month period by April 2004. The power house is a 28m X 25m RCC framed structure housing 2 X 2MW generating sets. The structural work was completed in April 2004, within an accelerated time schedule of three months.

The ancillary works include:

  • Foundation for fuel and oil storage tanks.

  • Water storage tanks.

  • Pump room.

  • Cooling tower.

  • Roads and drainage works.