Roads and Bridges

Shaheed-e-Millat Interchange

 


 

Shaheed-e-Millat Interchange

Location : 
Shahra-e-Faisal, Karachi
Client : 
Karachi Development Authority (Under World Bank Funding)
Engineer : 
ACER FREEMAN FOX – U.K. J/V A.A. Associates – PAK
Current Value : 
480 million Rupees


ACL was not the lowest bidder for this project but was awarded the contract on the strong recommendation of the Engineer and the World Bank project cell. The interchange is the first of its kind in Pakistan, with the contract involving design and construction of a 2km pre-stressed concrete structure. The project on completion has attained the status of a standard in quality construction.

Pakistan Motorway (M-2)

 

 

Pakistan Motorway (M-2)

Location : 
Rawalpindi District, Punjab
Client : 
Daewoo Corporation – South Korea
Engineer : 
Snowy Mountain EngineeringCompany (S.M.E.C.) – Australia
Current Value : 
240 million Rupees
 
ACL was one of only four Pakistani construction companies selected by Daewoo Corporation as Subcontractors for this prestigious project. The contract comprised of 8 river and drain bridges and 24 other concrete structures, including road underpasses, constructed over a period of 2 years.


Bridge Over River Kabul



 

Bridge Over River Kabul

Location : 
Nowshera, N.W.F.P.
Client : 
Communication & Works Dept. Govt. of N.W.F.P.
Engineer : 
Omar Munshi & Associates
Current Value : 
420 million Rupees


This 500 meters long Pre-stressed  Concrete bridge was constructed over the fast flowing River Kabul in N.W.F.P. Province. The work scope included construction of 1.2 mØ, 40 m deep piles in water flowing at 4m/sec. The work was completed on schedule and to the satisfaction of the client.

Bridges In Azad Kashmir

 

 

Bridges In Azad Kashmir

ACL has been constructing bridges in the remote area of Azad Kashmir since 1982. These bridges are built over rivers prone to flash floods and located in areas with limited access and poor communication facilities.

Some of the more recent bridges completed by ACL are Akbari, Rehman and Kahori.

Akbari and Rehman Bridges

Client: 
  

Superintendent Engineer, PWDHighway Circle-Muzzaffarabad
Current Value: 
Rs 60.00 million

Akbari and Rehman bridges located in District Kotli are 3 span prestressed concrete with each span being 32m in length. The 30m high reinforced concrete pier shafts were raised from the river bed in a deep ravine with steep sides slopes.

Kohari Bridge

Client:   
Superintendent Engineer,PWDHighway Circle-Muzzaffarabad
Current Value: 
Rs 35.00 million

Kohari bridge located in District Muzzaffarabad is a 108m long bridge with a central span of 30m simply supported on two 38m balanced cantilevers. The 36m high reinforced concrete pier shafts were raised from a river bed prone to flash floods.